CASE STUDY:
Pile & Beam RC Footings with Boundary Wall Stabilisation
VALUE:
£88,000
CLIENT:
LDB Construction
PROJECT SCOPE
We were appointed to complete the following works:
- Design & install temporary works to the unsafe boundary wall.
- Install mass concrete underpins to the boundary wall.
- Design and install bearing piles for a new garden office structure.
- Install RC pile caps/RC beams for new garden office structure.
FORCE SOLUTION
Adjustable props raking to MC thrust blocks enabled us to install the MC underpins in a hit-one-miss-two sequence without destabilising the boundary wall.
Following the underpinning, the piles were drilled with a restricted access piling rig, ground levels reduced, and the new RC footings installed.